top of page
White Sulphur Springs’ existing treatment plant had reached the end of its useful life and was no longer able to maintain a consistent quality of effluent. Following the success of the City of Dunbar wastewater plant, Ghosh Engineers proposed renovating portions of the existing treatment plant and constructing a new vertical loop reactor (VLR) basin. Ghosh assisted the City in obtaining $21M in Tax Incentive Financing (TIF) for this project which also included two (2) new clarifiers. Since construction completion, the City has consistently met their effluent requirements.
Highlights
-
2.5 MGD Daily Flow Vertical Loop Reactor (VLR) Capable of 8.0 MGD Peak Flow
-
Two (2) Peripheral Feel Rim Flow Clarifiers with Tow-Bro Sludge Removal. Each is 85’ in Siameter with a 14’ Side Wall Depth (SWD)
-
New Chlorine Contact Tanks and Centrifuge for Sludge Drying
REPEAT CLIENT SATISFACTION: Ghosh Engineers was hired
again to help meet the more stringent requirements of the City’s NPDES permit.
bottom of page



