top of page
The Raymond Street project was developed as part of the LTCP for the City to reduce combined sewer overflows. This project consisted of the replacement of 36” HDPE storm pipe with 60” HPDE storm pipe, with approximately 2,125 LF of storm pipe and 110 LF of sanitary sewer pipe constructed and separated the combined sewer system.
REPEAT CLIENT SATISFACTION: Ghosh Engineers has worked for the City of Follansbee on numerous water and wastewater projects since 1992.
bottom of page



