Beckley Water Company needed to relocate an existing 24” CIP waterline with operating pressures of 250 to 300 PSI in order for WVDOH to construct a new US Rt. 19 bypass from Eisenhower Drive to Beaver. This work needed to be performed without interrupting water service to nearly 15,000 customers. The Ghosh team of engineers worked with Beckley Water Company’s engineers and distribution system operators as well as with WVDOH and their consultant to determine the best location for the new waterline that would not conflict with the new roadway and bridge construction.
Highlights
-
Relocate 3,650 LF of Existing 6”, 12” and 24” Waterlines
-
Installation of Three (3) Pressure Reducing Valves
REPEAT CLIENT SATISFACTION: Jeff Ekstrom has worked as a Project Manager for Beckley Water Company on numerous water projects since 1992.